Rajasthan, India’s solar capital, is leading the way in rooftop installations. With PM Surya Ghar Muft Bijli Yojana 2025 and support from state DISCOMs (JVVNL, AVVNL, JdVVNL, RVPNL), residents can now install solar at very low net costs. This guide covers subsidy rates, eligibility, registration steps, and actual cost breakdown for rooftop solar in Rajasthan.
✅ Eligibility for Solar Subsidy in Rajasthan
- Only residential electricity consumers are eligible.
- Rooftop ownership proof required (property papers or NOC).
- System must be grid-connected and installed by empaneled vendors.
- Consumer should be linked to one of Rajasthan DISCOMs:
- JVVNL (Jaipur Vidyut Vitran Nigam Ltd.)
- AVVNL (Ajmer Vidyut Vitran Nigam Ltd.)
- JdVVNL (Jodhpur Vidyut Vitran Nigam Ltd.)
📑 Documents Required
- Aadhaar card (linked with mobile)
- Latest electricity bill
- Property proof / NOC if tenant
- Bank details for subsidy credit
- Passport photo
💰 Subsidy Rates in 2025
- Up to 3 kW: 60% subsidy (CFA)
- Above 3 kW up to 10 kW: 40% subsidy
- Note: Rajasthan currently does not offer additional state top-up beyond the central subsidy.
🔗 How to Apply for Solar Subsidy in Rajasthan
- Visit the National PM Surya Ghar Portal or respective DISCOM portal (JVVNL/AVVNL/JdVVNL).
- Register with Aadhaar + mobile OTP.
- Select an empaneled vendor from the approved list.
- Upload documents (Aadhaar, electricity bill, property proof, bank details).
- DISCOM verification & site inspection.
- Installation by vendor.
- Net meter approval and installation.
- Subsidy credited within 30–60 days post-installation.
📊 Cost of Solar Installation in Rajasthan (2025)
| System Size | Approx. Cost (₹) | Subsidy (₹) | Net Cost (₹) |
|---|---|---|---|
| 1 kW | 50,000 | 30,000 | 20,000 |
| 2 kW | 95,000 | 57,000 | 38,000 |
| 3 kW | 1,40,000 | 84,000 | 56,000 |
| 5 kW | 2,35,000 | 1,17,500 | 1,17,500 |
(Costs may vary depending on vendor and location)
⚡ Net Metering in Rajasthan
- Available for residential users up to 10 kW.
- Excess energy exported is adjusted against your monthly bill.
- Surplus units can be carried forward for 12 months.
- Net meter is installed by the respective DISCOM after system approval.
🏠 Example: 3 kW Solar in Jaipur
- Monthly generation: ~360 units
- Pre-solar bill: ₹2,400/month
- Post-solar bill: Zero (only fixed charges remain)
- Payback time: 3–4 years
❓ FAQs
Q1: How much subsidy is available for rooftop solar in Rajasthan?
→ Up to 60% subsidy for 1–3 kW systems under PM Surya Ghar.
Q2: Which DISCOMs allow rooftop solar in Rajasthan?
→ JVVNL, AVVNL, and JdVVNL.
Q3: What is the subsidy for 5 kW solar in Rajasthan?
→ Approx. ₹1,17,500, net cost ~₹1.17 lakh.
Q4: How long does it take to receive the subsidy amount?
→ Usually 30–60 days after installation and verification.
🚀 Conclusion & CTA
Rajasthan is the perfect place for rooftop solar, thanks to its high sunshine levels and generous subsidies. With up to 60% subsidy, installing solar is a smart investment that pays for itself in just a few years.

