Gujarat is a leader in rooftop solar adoption in India, thanks to strong government support and user-friendly registration via GUVNL (Gujarat Urja Vikas Nigam Ltd.). In 2025, homeowners can benefit from the PM Surya Ghar Muft Bijli Yojana along with the state’s streamlined subsidy mechanism. In this guide, we’ll cover eligibility, subsidy rates, costing, and step-by-step registration for Gujarat residents.
✅ Eligibility for Solar Subsidy in Gujarat
- Only residential consumers of Gujarat DISCOMs (MGVCL, DGVCL, UGVCL, PGVCL).
- Rooftop ownership proof required.
- System must be installed by empaneled vendors listed on GUVNL portal.
- Only grid-connected rooftop solar systems are eligible.
📑 Documents Required
- Aadhaar card (linked with mobile)
- Latest electricity bill
- Property ownership proof / NOC from landlord
- Bank account details (for subsidy credit)
- Passport photo
💰 Subsidy Rates in 2025
- Up to 3 kW: 60% subsidy (CFA)
- Above 3 kW to 10 kW: 40% subsidy
- State of Gujarat does not provide an additional top-up, but the subsidy is credited quickly via GUVNL portal.
🔗 How to Register for Solar Subsidy in Gujarat
- Visit the GUVNL Solar Portal.
- Select your DISCOM (DGVCL, MGVCL, UGVCL, PGVCL).
- Register with mobile + Aadhaar OTP.
- Select an empaneled vendor.
- Upload documents (Aadhaar, bill, property proof, bank details).
- DISCOM verification → Vendor installation.
- Net meter approval & installation.
- Subsidy transferred to your account in 30–45 days.
📊 Cost of Solar Installation in Gujarat (2025)
| System Size | Approx. Cost (₹) | Subsidy (₹) | Net Cost (₹) |
|---|---|---|---|
| 1 kW | 48,000 | 28,800 | 19,200 |
| 2 kW | 92,000 | 55,200 | 36,800 |
| 3 kW | 1,35,000 | 81,000 | 54,000 |
| 5 kW | 2,25,000 | 1,12,500 | 1,12,500 |
(Prices vary slightly across vendors and cities)
⚡ Net Metering in Gujarat
- Available up to 10 kW for residential users.
- Energy exported → adjusted against monthly consumption.
- Excess credits carried forward for 12 months.
- DISCOM installs the net meter after system approval.
🏠 Example: 3 kW Solar in Ahmedabad
- Monthly generation: ~360 units
- Average household bill: ₹2,500
- After solar: Zero bill (excluding fixed charges)
- Payback period: 3–4 years
❓ FAQs
Q1: What is the subsidy for 5 kW solar in Gujarat?
→ About ₹1,12,500, net cost ~₹1.12 lakh.
Q2: How to check approved vendors in Gujarat?
→ Visit Suryagujarat GUVNL portal and see the vendor list.
Q3: Is net metering compulsory in Gujarat?
→ Yes, for subsidy eligibility, the rooftop system must be grid-connected with a net meter.
Q4: How long does it take to get subsidy in Gujarat?
→ Generally within 30–45 days after installation and inspection.
🚀 Conclusion & CTA
With Gujarat’s simple GUVNL portal process and up to 60% subsidy, rooftop solar is highly affordable in 2025. Whether you install 1 kW or 5 kW, the savings are significant and long-term.

